Waterfront Place is entering its most significant construction phase yet — and if you haven’t been down to the waterfront recently, the pace of change will surprise you.
Here’s a complete rundown of every major active project, opening, and construction milestone happening at Port of Everett’s Waterfront Place right now, as of April 2026.
Restaurant Row: What’s Open, What’s Coming
The Port has completed two new restaurant buildings in Fisherman’s Harbor within the last six months. Current open businesses: Fisherman Jack’s (established), South Fork Baking Company (established), Rustic Cork Wine Bar (opened December 2025), The Net Shed Fish Market and Kitchen (opened December 2025), Tapped Public House (opened March 2, 2026 — rooftop deck is legitimately great). Coming spring 2026: Marina Azul Cocina and Cantina (family-owned Mexican from the Casa Azul team in Woodinville) and Menchie’s at the Marina frozen yogurt. One last parcel remains — the Port is seeking a high-end steakhouse or experiential dining concept to build out the final corner spot with boat-in access and a required rooftop deck.
Millwright District: 300+ Apartments Breaking Ground
The Millwright District is the most transformative phase of Waterfront Place. Developer LPC West (Lincoln Property Company’s Pacific Northwest arm) is breaking ground in 2026 on 300+ waterfront apartments alongside the Millwright Loop roadway, which completed construction in 2025. The office component is already in pre-leasing — up to 120,000 square feet of Class-A waterfront office space in up to three interconnected buildings with rooftop terraces, structured parking, and direct access to the marina promenade. This is the piece that turns Waterfront Place from a destination into a neighborhood.
The New Sculpture: A Girl, a Photo, and 80 Years of Everett History
One of the quieter additions to the waterfront this year is worth stopping to find. In February 2026, the Port unveiled a new bronze-cast sculpture along the Central Marina esplanade — a girl gazing out over the marina, inspired by a well-known 1940s photograph of a young Everett girl doing exactly that. The sculptor, Sultan-based artist Kevin Pettelle, also created the “Fisherman’s Tribute” sculpture near Scuttlebutt. Pettelle said this is among the last bronze pieces he will make in his career. The girl in the original photograph, it turned out, is a living Everett resident — she recognized her green plaid jacket and brown saddle shoes when Port staff shared the image with her. Find the sculpture near Pacific Rim Plaza and Boxcar Park on the Central Marina esplanade.
Marina Infrastructure: Guest Dock 1 and the Boat Launch
The Port’s 2026 capital plan includes $100,000 to begin reconstruction of Guest Dock 1 and upgrades to marina systems. Separately, the Port secured a $1 million grant from the Washington State Recreation and Conservation Office to fund renovation work at the Jetty Landing Boat Launch — the state’s largest public boat launch. In-water construction is anticipated to start in 2027. The new fuel dock, which opened in 2025, is operational.
Upcoming: Cleanup Day and Summer Events Season
The Port’s 32nd annual Marina and Jetty Island Cleanup Day is April 18 from 9 a.m. to noon — a free volunteer event with supplies provided. After that, the waterfront shifts into its summer events season: 90+ annual waterfront events including weekly summer concerts, the July Jetty Island ferry opening, and the annual holiday celebrations and festivals. The Jetty Island public ferry typically runs from late June through Labor Day.
Frequently Asked Questions
How many restaurants are at Waterfront Place right now?
14 cafes, breweries, and restaurants are currently operating, with Marina Azul and Menchie’s at the Marina expected to open spring 2026, and one final high-end parcel still available.
When does the Millwright District start construction?
2026. The residential component — 300+ apartments — is breaking ground this year. The office pre-leasing is already underway with Lincoln Property Company.
Where is the new Port sculpture?
On the Central Marina esplanade between Pacific Rim Plaza and Boxcar Park. It’s a bronze-cast girl gazing over the marina, inspired by a 1940s photograph. The sculptor is Kevin Pettelle of Sultan, WA.
When does the Jetty Island ferry open?
Typically late June through Labor Day for general public access. The April 18 cleanup day is one of the few chances to visit the island outside that window.
When will the Jetty Landing Boat Launch renovation start?
In-water construction is anticipated to begin in 2027. The Port secured a $1 million RCO grant to fund the renovation of the state’s largest public boat launch.
Leave a Reply