Facility management · Scope 3
Scope 3 Contractor Compliance Workbook
Five phases. Work the checklist live. Unlock the paste-ready contract clause and program summary with a work email.
Phase 1 — Vendor inventory
Map the contractor categories that actually move Category 1. Check what you run.
Phase 2 — Qualification
Add these to RFPs and existing-vendor surveys. Tier the pool.
Phase 3 — Contract language
The clause is the control. Unlock it below, paste into MSAs and emergency panel agreements before the next loss.
Phase 4 — Receiving process
Every restoration job needs an emissions record attached — not a year-end scramble.
Phase 5 — Inventory close
Compile primary data vs proxy. Document methodology. Flag material gaps for the auditor.
Unlock the clause and program summary
Work email. Role. That is the gate. The checklist above stays usable either way.
Used to send the clause pack and tag this as an FMJ workbook lead. No daily mail.
Paste-ready clause
Drop this into restoration and specialty-trade agreements. RCP is the methodology for restoration; GHG Protocol Category 1 for everything else.
The summary shall include: total fuel consumption by equipment type, vehicle miles traveled, waste materials removed by type and weight, and total equipment operating hours. Submissions shall be provided within 30 days of project completion, in PDF, CSV, or an API-compatible format.
Client retains the right to audit Vendor’s data collection process during the contract term. Failure to deliver a complete summary is a material vendor-performance issue at renewal.
Program summary
Generated from the boxes you checked. Export and attach to the FM / ESG file.